Extreme Networks Altitude 4760 Series Guida di Installazione Pagina 14

  • Scaricare
  • Aggiungi ai miei manuali
  • Stampa
Vedere la pagina 13
Warnings
Altitude™ 4760 Series Access Point Installation Guide
14
Take precautions to avoid injury from falling tools and equipment. Crews should wear
hard hats in and around the installation work site.
Be aware of vehicular traffic in and around the installation work site.
Do not operate a portable transmitter near unshielded blasting caps or in an
environment where explosives are present unless the transmitter is especially certified
for such use.
Refer to your site survey, network analysis reports to determine specific requirements for
each deployment.
Assign installation responsibility to the appropriate personnel.
Identify and document where all installed components are located.
Identify and prepare Ethernet and console port connections.
Verify that cable lengths are within the maximum allowable distances for optimal signal
transmission.
CAUTION
The maximum length allowed for PoE cables is 100 meters.
Vedere la pagina 13
1 2 ... 9 10 11 12 13 14 15 16 17 18 19 ... 83 84

Commenti su questo manuale

Nessun commento